Hypothetical Development

Reverse-engineer the land value from the project: gross realisation less every cost a competent developer would incur, finance modelled month-by-month.

method.hypothetical-developmentv3.0.0Either: Insitive-hosted OR in-house API

Methodology

Also called the residual method, the hypothetical development approach values a development site by subtracting from the projected gross realisation every cost a competent developer would incur — construction, professional fees, selling costs, finance and a market-required margin for profit and risk. What is left over is the residual that can be paid for the land.

This module runs a time-phased monthly feasibility rather than a single-line residual: construction and professional fees draw down on an S-curve, sales settle over a defined window, and finance is charged on the actual outstanding (drawn) balance each month — including interest on the land draw itself. The residual is solved by iteration, and the same monthly cash flow yields the project IRR, profit on cost and a price/cost sensitivity grid.

The Insitive module orchestrates the feasibility composition: pulling planning permissions and constraints from the cadastre module, gross realisation from the comparable sales module, costs from your build-rate API, and finance from your debt assumptions. The result is a fully transparent residual land value backed by line-item evidence.

When to use it

  • Englobo and infill development sites.
  • Heritage-listed sites with adaptive re-use potential.
  • Sites with a current DA / planning permit where end-product is well-defined.
  • Strata subdivision and townhouse-style development.

Standards & references

  • IVS 410 — Development Property (IVS 2025).
  • IVS 105 — Valuation Approaches and Methods (residual / feasibility under the market and income approaches).
  • API Professional Practice 2021 — Australian Property Institute (adopts IVS).
  • AASB 102 — Inventories (developer accounting context).

Plugin interface

Every method is a self-contained module that plugs into the Valuation App. It exposes a typed input/output schema so it can be invoked from a report writer, a workflow, or your own backend.

Inputs
  • scheme : DevelopmentScheme
    Lots / units, GFA, mix and end-product specs.
  • grv : Money
    Gross realisation (sum of end-product values).
  • costs : CostSchedule
    Hard, soft, holding and finance costs.
  • programme : Phasing
    Construction and settlement windows for monthly phasing.
  • profitRisk : Ratio
    Required developer margin (% of net realisation).
Outputs
  • residual : Money
    Indicated land value (residual).
  • feasibility : FeasibilityReport
    Monthly cash flow, phased finance, IRR and sensitivity grid.
i
Insitive

Buy better on the open market.

Information on this platform is general in nature, may be incomplete, out of date or inaccurate, and is not financial, legal, valuation or property advice. Data is sourced from third parties and provided without warranty. Verify independently and seek professional advice before acting. See our Disclaimer for details.

Terms of ServicePrivacy PolicyDisclaimerTrademarksCookies

INSITIVE™, ILR™, VALIDATE™, OPEN MARKET™ and BUILDR™ are trade marks, and BUILDHQ® is a registered trade mark, of Applied AI Pty Ltd.

© 2026 Applied AI Pty Ltd. ABN 90 668 168 830. All rights reserved. · appliedai.com.au